Restoration of Sant Esteve Church

Marganell

Project description

The church is structurally consolidated and a transparent glass roof is proposed to allow the use of the covered interior space without altering the exterior image of the building.

The glass roof is placed about five meters high, at the point where all the walls are regular. It is formed by a metal structure formed by beams embedded in the original stone walls and a free-standing perimeter profile that also acts as a channel for rainwater. In the apse area, the metal profiles form a semi-circle, adapting to the curvature of the walls.

The proposal also contemplates reopening access to the bell tower via a metal staircase. The staircase reaches the highest part of the tower, where a viewpoint towards the mountain of Montserrat is created.

Historical-archaeological research conducted by Ainhoa Pancarbo, Roger Sala, Pedro Rodríguez, and Helena Ortiz-Quintana (Barcelona Provincial Council).

DIGITAL BIBLIOGRAPHY

       See article

        See article

     See article

 See article

     See article

         See article

               See article

                See article

                  See article

    See article

See article

See article

  See article

 See article

Data sheet

Project dateJuny 2023

Completion dateDesembre 2024

Architect/sPere Santamaria

PromoterAjuntament de Marganell

Area177,18 m2

Budget160.000 €

BuilderKollatec

PhotographyJudith Casas

Awards1st prize Archello Awards 2025 / Nominated "Building of the year 2026" Archdaily / Selected Premis Catalunya Construcció CATEB 2025 / Selected 13 Bienal Paisatge